Elliot Crossing
Grant, MN
Turnkey Package Project
Features:
14 Unit Project
18 Week Duration
Mid-project design reconfigurations based on phase 1 feedback.
Close coordination with builder and architect for ongoing adjustments.
Pre-purchased materials to lock in pricing amid market uncertainty.
Woodhelm Townhomes in Lake Elmo, MN is a 14-building townhome community where the project did not go exactly as originally planned -- and JL Schwieters adapted without skipping a beat.
Mid-project, the builder and architect needed to reconfigure the party wall design based on what they learned in phase 1. That kind of mid-build change can stall a project for weeks when the framing contractor is not deeply integrated with the design team. Because our team works directly alongside the architect and builder from the start, we were able to value engineer the party wall changes, update the panel manufacturing specs, and keep phase 2 moving on a revised design without losing the schedule.
Timing was also a factor on the materials side. With lumber prices volatile, we pre-purchased key materials early in the project to lock in pricing and protect the budget. That proactive approach kept costs predictable and ensured no supply delays on a multi-phase project where schedule pressure compounds across buildings.
We completed the 14-building community in 18 weeks with a full turnkey package -- wall panels, trusses, and installation all through JL Schwieters. For townhome developers and general contractors in Lake Elmo and the east Twin Cities metro, this is what an experienced framing partner looks like when plans change.
Frequently Asked Questions
-
We delivered a complete turnkey framing package, including wall panels, trusses, and labor. Our team worked side by side with the builder and architect to manage design reconfigurations and keep construction on schedule.
-
We collaborated closely with the project team, incorporating feedback from phase 1 and value engineering solutions into phase 2. This flexible approach ensured the 14 building townhome community stayed on track without compromising quality.
-
To offset market volatility, we pre-purchased key materials early in the project. This proactive strategy locked in pricing, kept costs predictable, and ensured uninterrupted progress
-
Woodhelm Townhomes -- 14 buildings in Lake Elmo -- was completed in 18 weeks with a full turnkey framing package. Timeline depends on the number of buildings, design complexity, and phasing. Multi-phase townhome projects benefit significantly from prefabricated wall panels and trusses, which reduce per-building framing time and let crews move from building to building efficiently.